怎样防止清水墙面污染

来源 :建筑工人 | 被引量 : 0次 | 上传用户:zcv_2323
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
清水墙面污染的因素很多,需要分析原因,采取有针对性的措施,认真地加以解决。一、结构阶段的污染及防止措施1.浇筑组合柱和圈梁混凝土时,水泥浆流淌污染墙面。组合柱和圈梁的外包12厘米砖墙,不但要保证水平灰缝饱满,而且要做到立缝砂浆饱满,防止漏浆。浇筑组合柱和圈梁混凝土前,在柱内、梁内浇水冲洗时,应将外墙面也浇水湿润。当发现组合柱或圈梁有 There are many factors in the clean water wall pollution, and it is necessary to analyze the causes, take targeted measures, and seriously solve them. First, the structure of the stage of pollution and prevention measures 1. When pouring composite columns and ring beam concrete, the cement slurry flow contaminated the wall surface. The 12cm brick wall out of the combined column and ring beam shall not only ensure that the horizontal mortar joints are full, but also that the vertical seam mortar is full to prevent leakage of the slurry. Before pouring the combined column and ring beam concrete, the outer wall should be watered and moistened when it is washed in the column and in the beam. When a combination column or ring beam is found
其他文献
期刊
招标投标是工程项目建设的一项重大改革措施,它不仅可以促进工程质量的提高,而且也有利于开发商控制工程投资.通过招标可以把一些有实际经验、信誉良好、业绩显著、资质符合
本文以中国近代的文献资料为基础,以媒介环境学和媒介史为理论基础,探寻在近代中国中西文化交汇之时,从西方传入的电报媒介对近代中国社会的带来的影响。电报作为近代中国社
2009年9月7日,山东电建一公司与中联重科正式签署协议,由中联重科为山东电建一公司在印度新上马的电建项目提供总价值达4000万的首期吊装设备,其中包括1台QUY600履带起重机。
1 引言rn近年来,建筑市场供过于求,僧多粥少,中小建筑企业价格战硝烟四起,本文希望从经济学角度探寻为什么中小建筑企业热衷于价格战,而中小建筑企业又怎样通过实施低成本战
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
一幢约2000米~2的砖混住宅,地面以上重约4000吨。这么多的重物,都要通过建筑工人采用“吊、砌、灌,绑、钉、安”等方法,安放到设计的指定位置上。仅砌砖就要一块一块地砌50
2009年9月8日,沈阳北方交通重工集团和辽宁工程技术大学产学研签约仪式暨煤机产品交流会在北方交通重工驻地举行。北方交通重工集团董事长曲凯与辽宁工程技术大学书记倪国玉
根据党的十六大和十六届四中全会精神,中共中央下发了[2004]20号文件,决定从2005年元月开始,用一年半左右的时间,在全党开展一次以学习实践“三个代表”重要思想为主要内容的
期刊