2016年汛期清江梯级水电站同时开闸泄洪,汛后对高坝洲大坝消力池、隔河岩大坝消力池、隔河岩一级升船机上闸首门槽、晒谷坪电站进水口、水布垭大坝R4-R5面板、水布垭电站进水口等处进行了水下检查,发现了隔河岩大坝消力池底板有大面积冲磨,对高坝洲大坝消力池、水布垭电站进水口拦污栅淤积物进行了清理,消除了电站运行安全隐患,对冲磨较严重的部位将择时进行修复。
During the flood season in 2016, the Qingjiang cascade hydropower station will also be floodgated. After the flood season, the floodgates will be dampened by the sluice gates of the Xiabazhou dam, the Geheyan dam, the sewer gate at the Geheyan level, , Shuibuya dam R4-R5 panel, Shuibuya station inlet and other places under the water and found that Geheyan dam digester floor with a large area of the ground, the Dam dam dam dissipation Pool, Shuibuya station inlet trash silt cleared, eliminating the safety hazards of power plant operation, the more serious parts of the mill will be selected timing repair.