论文部分内容阅读
2008年11月,一座采用坚固耐用的Accoya热带硬木制成的450t重拱桥被安装在荷兰斯内克A7公路的上方。Wagenborg Nedlift用了48轴自行式模块化拖车和6台全地面起重机完成了这项工作。
In November 2008, a 450-tonned heavy arch bridge made of rugged Accoya tropical hardwood was installed above the Snek A7 road in the Netherlands. Wagenborg Nedlift did this job with a 48-axle self-propelled modular trailer and six all-terrain cranes.