论文部分内容阅读
位于阿根廷和巴拉圭两国边界的亚西雷塔水电工程装机3 200 MW,电站规模大,复杂性高, 要求控制系统具备一些特殊功能。阐述该系统的设计特点。
The Ascetta Hydropower Project, located on the border between Argentina and Paraguay, has a capacity of 3,200 MW. The large and complex power plants require special features of the control system. Describe the design features of the system.