由中国华能集团公司、阿坝州政府和四川省电力局联合集资兴建的、四川省“八五”期间重点建设项目——太平驿水电站,自1990年12月初开始进行导流隧洞及引渠工程的招标以来,至1991年7月底,已先后完成了导流隧洞及引渠、引水隧洞、首部枢纽和厂区枢纽等主体工程的招标工作。在此之前。我院受建设单位的委托,按期或提前完成了各项招标工程的招标设计、施工规划研究以及招标文件的编制工作。在省、部各级领
The Taipingyi Hydropower Station, a key construction project during the “Eighth Five-Year Plan” period funded by China Huaneng Group, Aba Prefecture Government and Sichuan Provincial Electric Power Bureau, was started in early December 1990 to start the diversion of tunnels and channels Since the bidding, by the end of July 1991, the bidding for diversion tunnels and diversion channels, diversion tunnels, the first hub and the factory hub has been completed successively. Before that. Our hospital entrusted by the construction unit, on schedule or ahead of schedule to complete the tender of the tender design, construction planning research and preparation of the tender documents. In the provincial and ministerial leaders at all levels