江厦潮汐试验电站位于浙江省温岭县江厦港上。该港长9公里,坝址处港宽686米,为东海乐清湾北端封闭浅海半日潮港,其最大潮差达8.39米,为我国高潮差区。根据地形条件,电站采用单库双向开发,是一座双向(涨、落潮)发电、双向泄水的潮汐试验电站。电站总容量为3,000千瓦,1973年4月开工,1980年
Jiangxia Tidal Power Station is located in Jiangxia, Wenling County, Zhejiang Province. The port is 9 kilometers long and the dam site is 686 meters wide. It is the semi-day tide harbor closed at the northern end of Yueqing Bay in the East China Sea. The maximum tidal range is 8.39 meters, which is the difference between high tides in China. According to the terrain conditions, the power station adopts single-storey two-way development and is a two-way (up and down tide) power generation and bidirectional drainage tidal power station. The total power plant capacity of 3,000 kilowatts, started in April 1973, 1980