论文部分内容阅读
通过对芦潮港老闸中孔闸门更换设计,从门型、门叶结构、止水、滚轮,在配合原有土建的基础上,设计中孔闸门。同时复核原有启闭机能否满足闸门的启闭要求。对芦潮港老闸实施二次维修,使老闸继续承担区域行汛排涝的要求;如何正确对待和妥善处理“老龄化”的水利工程,是水利行业研究的新课题,该工程设计可为今后同类工程参考。
Through the design of Luchaogang old gate middle hole gate replacement, from the gate type, door leaf structure, water stop, roller, with the original civil construction, based on the design of the hole gate. At the same time check the original hoist can meet the gate opening and closing requirements. The second repair of the Luchaogang old sluice is carried out so that the sluice can continue to undertake the flood control and drainage requirements in the region. How to properly handle and properly handle the “aging” water conservancy project is a new issue in the research of the hydropower industry. The project design For similar projects in the future reference.