论文部分内容阅读
(接上期)要因确认五末端原因:网络运行不稳定;确认内容:稳定情况;确认方法:现场测试;确认标准:网络丢包率≤1%,网络时延≤50ms(伴随突变)。确认情况:1.2010年6月11日,小组组员张明卉与分公司技术人员现场测试了7个考虑接受集团MAS业务单位的网络运行情况。(1)测试方式:点对点。规定A点为固定测试点(新浪首
Confirm the content: stable situation; Confirmation method: field test; Confirmation standard: network packet loss rate ≤1%, network delay ≤50ms (with mutation). Confirmed the situation: 1.2010 June 11, team members Zhang Ming Hui and branch technicians on-site testing of 7 considered to accept the Group MAS business unit network operation. (1) test method: point to point. A point for the fixed test points (Sina first