论文部分内容阅读
单机独掌多次循环及单机多掌多次循环,本来是一项推行较早的先进作业经验,但是如何进一步提高,却是一项需要通过不断实践继续解决的问题。59年以来,在党的领导及总路线的光辉照耀下,通过大搞群众运动,在这方面有着较大的提高和革新,全公司推广面约占80%,基本实现坑探施工多次循环化,有40%的掘进小组在独掌上台月效率突破180M,提前超额完成了59年的任务,并取得了如下收获:1.加强了各工种之间的协作,提高了技术操作水平,增加了纯打眼时间,提高了工时利用,降低了辅助时间。
The single-handed single-handed multiple-cycle and single-machine multiple-hands multiple cycles were originally an advanced operation experience. However, how to further improve it is a problem that needs to be solved through continuous practice. In the past 59 years, under the glorious leadership of the party and the general line, through mass participation in the mass movement, there have been major improvements and innovations in this area. The entire company’s promotion area accounts for about 80%, and the pit exploration construction has been largely recycled. , 40% of the excavation team achieved 180M efficiency in the month of the single-handheld Taiwan, and completed over 59 tasks ahead of schedule in advance, and achieved the following gains: 1. Strengthened collaboration among various types of work, improved the level of technical operation, increased Purely time, improve the use of man-hours, reducing the auxiliary time.