有80年历史的劳芬堡水电站在研究延长20年运行许可证时,提出了不同的比较方案.1984年提出了颁发延长80年营业许可证的可行性方案,然而这个方案被完全否定.结果,导致了根本不同的思路,并据此作出了最终改建方案及提出申请许可证.作为申请许可证的附加条件,水电厂的设计流量应增加40%.为了实现当局规定的结构工程开工的最后期限,首先对各项工程进行了优化,特别是对各种工程比较方案的水工模型试验和费用估算做了优化选择.
The 80-year-old Laufenberg hydropower plant proposed different comparisons when it came to studying the extension of the 20-year operation permit. The feasibility of issuing an extension of the 80-year operating permit was proposed in 1984, but the solution was completely rejected. , Resulting in fundamentally different ideas, and accordingly made the final rebuilding program and apply for permits.As an additional condition for applying for permits, the design flow of hydropower plants should be increased by 40% .In order to achieve the end of the construction of structural work started by the authorities Term, first of all, the project has been optimized, in particular, a variety of engineering comparison schemes hydraulic model tests and cost estimates made an optimal choice.