论文部分内容阅读
近期,在朔黄铁路LTE宽带移动通信工程建设项目招标中,艾默生网络能源成功中标,为该项建设提供了一大批PS系列开关电源系统和ATP系列小型机房专用空调系统等高品质设备,有力地保障了朔黄铁路沿线基站的稳妥运行,帮助朔黄铁路成功建成了安全、高效的铁路通信网络。朔黄铁路正线总长近600公里,2002年11月1日全线建成,总投资150亿元,是我国目前投资与建设规模最大的一条合资铁路。为了提高朔黄铁路运输能力,满足开行2万吨货运重载列车条件,需要尽快建设朔黄铁路LTE*通信网络。LTE宽带移动通信技术的运用,不仅在朔黄铁路尚属首次,即使在世界
Recently, during the Bidding for the LTE Broadband Mobile Telecommunication Project in Shuohuang Railway, Emerson won the bid for its network energy, providing a large number of high-quality equipment such as PS series switching power supply system and ATP series small room dedicated air-condition system for the construction. It ensured the safe operation of base stations along Shuang-Huang Railway and helped Shu-Huang Railway successfully build a safe and efficient railway communication network. The total length of the main line of Shuohuang Railway is nearly 600 km. It was completed on November 1, 2002 with a total investment of 15 billion yuan. It is the largest joint-venture railway currently under construction and investment in China. In order to improve the transportation capacity of Shuohuang Railway and meet the conditions for launching 20000 tons of freight heavy haul trains, it is necessary to build the LTE * communications network of Shuohuang Railway as soon as possible. LTE broadband mobile communication technology, not only in the first time Shuohuang Railway, even in the world