在寒冷的冬季,建筑工程施工采取冬期施工措施是为了使施工能够顺利进行,并保证施工质量符合有关规范、标准的规定。由于我国南北纬度跨度大,东西海拔高差大,使得北部和西部高海拔地区总体呈现冬长夏短,许多地区冬季长达3~6个月,有的地区甚至更长。冬季是不利于建筑工程施工
In the cold winter, the winter construction measures taken in the construction of the project is to make the construction proceed smoothly, and ensure the construction quality in line with the relevant norms, standards. Due to the large latitude of north-south in our country and large elevation difference between east and west, the winter and summer are short in the northern and western high-altitude regions, while the winter in many regions is as long as 3 to 6 months in winter and even in some regions. Winter is not conducive to construction