2016年1月4日(“二九”的第5天)到1月9日(“三九”的第一天)某项目4栋高层的3层和4层主体混凝土在达到临界强度前的管理叙述如下。11号楼11号楼3层C40混凝土于2016年1月4日上午8时开始使用汽车泵浇筑到晚上11时完。5日上午将楼面上的塑料布、毛毡覆盖物拆除,开始4层墙体放线,随后使用的悬挑钢梁开始运到楼面,中午外墙模板开始拆除后悬挑钢梁进行安装。6日早上内部的
January 4, 2016 (the first day of the “January 29”) to January 9 (the first day of the “March 9”) The concrete of the 3-storey and 4-storey main storeys of a project 4 reaches Management before the critical strength is described below. Building 11, Building 11, Building 3 C40 concrete will begin pouring at 20:00 on January 4, 2016 using a car pump until 11 pm. On the morning of the 5th, the plastic cloth and felt cover on the floor were removed and the wall of the 4 floors was put off. The cantilevered steel beam used then started to be transported to the floor. After the noon external wall template began to be dismantled, the cantilevered steel beam was installed . 6th morning inside