江垭水电站地下厂房 2× 2 0 0t双小车桥式起重机的机构构件和电气控制系统采用了目前国际上较先进的技术。这些技术首次应用于国内水电站桥机中。监理工程师参加了桥机设备采购招标文件审查 ,招标评标产品设计联络会、制造中间检查、设备出厂验收 ,以及设备安装、调试全过程的监理 ,对各个环节出现的问题及时提出解决方案 ,保证了桥机的顺利安装。
Jiang Ya hydropower station underground power plant 2 × 2 0 0t double trolley overhead crane structural components and electrical control system uses the more advanced international technology. For the first time, these technologies are applied to bridge machines in domestic hydropower stations. Supervision engineers participated in the review of bidding documents for bridge machine equipment procurement, bidding and bid evaluation product design liaison meetings, manufacturing intermediate inspection, equipment factory acceptance, and supervision of equipment installation and commissioning in the whole process, and put forward solutions to ensure the timely emergence of problems in all aspects The bridge machine installed smoothly.