论文部分内容阅读
8月7日,总局空管局召开了高度表拨正程序和过渡高度层改革实施动员大会。总局空管局领导苏兰根、吕小平、刘亚军、李顺才,总局飞标司刘炳权助理巡视员,总局空管局有关处室及7个地区空管局分管有关工作的领导和有关单位的代表出席了会议。苏兰根常务副局长主持了会议,刘亚军副局长主持了总局空管局与有关单位签署责任书及7个地区空管局与有关单位签署责任书仪式。会上听取了7个地区空管局对有关工作落实情况的汇报和苏兰根常务副局长的讲话。从8月9日零时起,全国有31个对外开放的国际机场,首先实施高度表拨正程序和过
On August 7, the Air Traffic Control Administration of the SAIC held the mobilization meeting of the altimeter altimeter and the transitional level reform and implementation. SASAC leaders Su Langen, Lu Xiaoping, Liu Yajun, Li Shuncai, Assistant Chief Inspector Liu Bingquan of the General Administration of Aeronautics and Astronautics, the relevant offices of the General Administration of Taxation and seven regional air traffic control authorities in charge of relevant work and representatives of relevant units attended the meeting . Deputy Director Su Langen presided over the meeting, Liu Yajun, deputy director chaired the Air Traffic Control Administration and relevant units signed a letter of responsibility and the 7 regional ATC and relevant units signed a letter of responsibility ceremony. At the meeting, seven regional air traffic control authorities were briefed on the implementation of the work and the speech made by the Deputy Director-General of Sulan Dan. From 0:00 on August 9 onwards, there are 31 international airports open to the public in the country. First, the altimeter allegation and implementation procedures