莲花面板坝填筑施工质量控制

来源 :水利水电施工 | 被引量 : 0次 | 上传用户:Matousec
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
莲花电站面板堆石坝从石料开采、加工制备到上坝填铺碾压,实行全过程的质量控制。依照规范和设计要求,进行了堆石料的爆破、碾压试验及垫层料的制备、掺合级配试验,优选出一套合理的碾压参数和检验压实密度的评定标准,从而为进行施工质量控制和检验压实质量提供了依据。在监控过程中,由大坝指挥部统一协调和研究解决质量或进度难题,以保证获得良好的填筑密实度。 Lianhua Hydropower Station rockfill dam from the stone mining, processing and preparation to the dam filling shop, the implementation of the entire process of quality control. In accordance with the specifications and design requirements, blasting of rockfill materials, rolling test and cushioning material preparation, blending gradation test, a reasonable set of rolling parameters and testing compaction density evaluation criteria, so as to carry out Construction quality control and testing compaction quality provided the basis. In the monitoring process, the command of the dam will coordinate and study the problems of quality or progress in a unified manner so as to ensure good compaction of filling.
其他文献
江西省武宁县盘溪水利枢纽是一座以发电为主的中型水利水电工程。实行建设监理制两年多来,在质量控制方面,从3个环节着手,即“事先控制,坚持开工许可证制;中间跟踪,坚持现场检查制;事
访问合孚行有限公司董事长、总经理杨咏曼亦称得上是“好事多磨”,早在去年下半年就和她约定,一直到今年5月才”如愿以访”。她迟迟不肯接受访问的理由是“我没什么可写的。
阿拉善盟是全区面积最大、人口最少、生态最恶劣、生存环境最差的一个盟。近几年来,面对全盟经济社会发展中的种种困难和问题,盟委始终把中心组学习放到重要位置,通过学习科
生于70年代,学生时期在80年代的人,在青涩的学生时代,可能都有一个共同的经历:为希望工程捐款。从父母那里要到一块两块钱,更多的人把自己攒了很久才攒满的小猪储蓄罐带到学
茅坪溪防护工程建设进展顺利三峡大坝的组成部分一茅坪溪防护工程建设进展顺利。继泄水建筑物1994年9月竣工并投入运行后,紧接着就转人了防护大坝的施工。截至1995年底止,防护大坝沥青混
三门峡2号泄流洞出口加固工程施工技术管理王青,乐金苟,周仲雄,魏健(三门峡水利枢纽管理局河南三门峡472000)三门峡水利枢纽左岸2号泄流排沙隧洞自1968年投入运用以来,出口岸坡多次出现塌方。特
据安德鲁·加弗德报道,经济混乱是前苏联建筑业陷入困境的主要原因。独立后的一些新国家不是需要劳动力,而是需要西方国家的资金。在亚当·史密斯研究所最近于伦敦举行的一
In order to evaluate the soil erosion rate for different land uses and make recommendations on land-use alternatives for erosion control in hilly and mountai
随着半导体技术的进步,集成小尺寸绝缘体上硅器件的芯片开始应用到航空航天领域,使得器件在使用中面临了深空辐射环境与自身常规可靠性的双重挑战.进行小尺寸器件电离辐射环
1997年7月16日,平班水电站预可行性研究报告在南宁通过审查,审查会由电力工业部水电水利规划设计管理局会同广西壮族自治区计委和贵州省计委共同主持,广西壮族自治区计委副