Asscessment of the clinical value of CK-M2 and oligosaccharide protein inserum from patients with ga

来源 :世界胃肠病学杂志 | 被引量 : 0次 | 上传用户:wqvbqjxtid1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
AIM To evaluate the clinical value of creatine kinase macroisoenzyme type 2 (CK-M2) and oligosaccharideprotein (OP) in serum from patients with gastric carcinoma (GC).METHODS Serum level of CK-M2 was detected by agar gel electrophoresis. OP concentration was measuredby an enzyme immunoassay.RESULTS Serum levels of CK-M2 and OP in 57 cases of GC were significantly higher than those in 51 caseswith gastric precancerous lesion and 28 controls. The diagnostic sensitivity and specificity for GC with CK-M2 was 56.10% and 98.63% respectively. CK-M2 and OP were not associated with histologic type and degreeof differentiation.CONCLUSION These results suggest that CK-M2 may serve as a marker to diagnose GC, and the specificityis higher, whereas OP is not more significant for GC diagnosis, but it could be a useful indicator forevaluation the status of body immune.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AIM To study the biopathologic characteristics of the transitional mucosa (TM) adjacent to rectalcarcinoma and the resecting length of bowel.METHODS Immunohisto
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AIM To evaluate the clinical significance of early nutrition support in severe head-injured patients.METHODS One hundred and forty cases (GCS≤8) were randomly
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AIM To evaluate the effects of expandable metallic stent biliary endoprostheses (EMSBE) viaultrasonographic guided percutaneous transhepatic approach on the tr
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥