论文部分内容阅读
通过对安阳钢铁集团公司小型厂 2 60机组冷床进行改造 ,解决了原上、下卸钢装置因技术落后而影响产品质量和产量的问题 ,冷床冷却能力大大提高 ,使整个机组生产水平和技术水平达到一个新的高度
By reforming the cooling bed of Unit 2 60 of Anyang Iron and Steel Group Company, the problem of affecting the product quality and output due to technical backwardness of the original upper and lower unloading installations has been solved. The cooling capacity of the cooling bed has been greatly improved, and the entire unit production level and Technical level reached a new height