一、基本情况 二河东堤为Ⅰ级堤防,武墩以南段长15.3km,现状堤顶宽6.4~9.0m,堤顶高程17.7~18.5m,迎水面边坡1:3,背水坡分为三级,顶高以下3m边坡1:3,下接1:5坡至高程11.0m戗台,戗台宽约10m,外坡1:3至地面,地面高程9.0m左右,该段采用人力填筑,质量较差。1978年大旱时,堤身多处沉陷,并产生纵横向裂缝。为此,水利、交通等部门先后多次对大堤进行了粘土充填灌浆。 1980年汛期人工抢做后戗,但基本上没有碾压。
First, the basic situation The Second East River embankment for the I-class embankment, the southern section of the Wudun 15.3km, the current width of the embankment 6.4 ~ 9.0m, embankment elevation 17.7 ~ 18.5m, facing the water slope 1: 3, the back water slope is divided into Level 3, 3m above the top of the slope 1: 3, followed by a slope of 1: 5 to 11.0m Taiwan, Taiwan is about 10m wide, slope 1: 3 to the ground, the ground elevation of about 9.0m, the use of human Fill, poor quality. During the drought in 1978, dike bodies subsided in many places and caused longitudinal and transverse cracks. To this end, water conservancy, transportation and other departments have on the embankment clay filling grouting. After the robbery in the flood season in 1980, it was basically unopened.