沈家水电站2号机振动原因及其处理方法

来源 :水电站机电技术 | 被引量 : 0次 | 上传用户:ynshisss
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
沈家水电站二号机自并网发电后,发生剧烈振动,为了避开振动区,只能在额定出力55%以下工况运行,造成经济损失。我们通过反复检查,找出了振动原因,采用在尾水管中加设肋板的办法消除了振动,使机组达到设计出力,提高了经济效益。电站装机容量2×250千瓦;水轮机型号HL110—WJ—42;发电机型号TSWN74/56—6;设计水头70米;单机引用流量0.52秒立米;吸出高度2.5米。为并入华东电网的迳流式水电站。 After the grid-connected power generation of No.2 unit of Shenjia hydropower station, violent vibration occurs. In order to avoid the vibration zone, it can only operate under the condition of 55% rated output and cause economic loss. After repeated inspections, we found out the causes of vibration and eliminated the vibration through the addition of ribs in the draft tube, which enabled the unit to achieve the designed output and increased the economic benefits. Power plant installed capacity of 2 × 250 kW; turbine model HL110-WJ-42; generator model TSWN74 / 56-6; design head 70 meters; stand-alone reference flow of 0.52 seconds; suction height of 2.5 meters. For the merger into the East China Power Chuanli Hydropower Station.
其他文献
烃源岩热演化程度是判断一个盆地是否具备生油能力的重要指标 ,因此烃源岩的热成熟度是石油工作者研究的重点。二苯并噻吩由于具有对称的分子结构 ,因此具有很宽的热成熟范围
(一)概述龙羊峡水电站主厂房布置在主坝下游约70m。厂房全长95.5m(不包括安装间),跨度245m,高61.28m。机组中心距23m,厂房内安装4台32万kW水轮发电机组。为了缩短主厂房直线
近年来,语言与文化的关系已成为语言研究的一个重要课题。人们越来越多地认识到语言有着丰富的文化内涵,外语教学不仅仅是语言知识教学,而且更应该包括文化教学。本文从语言
南雅河三级电站共装三台高落差高转速水轮发电机组,转速为500转/分,落差为260米,容量为4万千瓦。第一台(2号机)己于83年一季度投产发电;第二台(3号机)也于83年底投产发电。
中职与自考专科衔接班《计算机应用基础》合格率低,成为影响学生按期毕业的拦路虎。在分析和研究的基础上,提出了提高合格率的一些措施和建议。 Secondary vocational and s
薄膜体声波谐振器(FBAR)技术,是一种基于声体波谐振的新技术。当一交变射频电压施加于两电极之间时,在压电薄膜内形成交变电场。通过压电薄膜的逆压电效应产生的机械形变激发
1981年昭平台水电站集水井排水设计的液位信号器(见示意图),经几位技术工人共同制作完善,于1982年初投入使用。多年实践证明,它具有接点容量大、可靠性高、动作直观、制作容
在磨合中走向成熟——今年上半年我国外贸形势综述中国外贸在痛苦的磨合中开始逐渐走向成熟。自1996年元月国家再次下调出口退税开始的外贸滑坡,随着去年下半年政府及企业自身的一
近几年来,黑龙江省在水利工程上应用的无纺过滤纤维滤布(简称土工织物)已达30万m~2。在江河护岸、土坝反滤上应用较多;在织物产品、工程设计等方面也已渐趋成熟。土工织物在
(一) 基本情况红英汇流水电站位于河南省林县,是一座渠道引水式小型电站,装机两台共2500kW,先后于1973年10月和1974年5月投入运行。水轮机主要参数为:型号HL123-WJ-71;功率1