论文部分内容阅读
奥地利从60年代中期以来就着手开发齐勒尔流域上游(upper Ziller valley)和泽姆流域上游(upper Zemm valley)的水能资源,组成泽姆-齐勒尔水电系统(Zemm-Ziller power scheme),分批分期进行施工。3座电
Austria has been working since the mid-1960s on the development of hydropower resources in the upper Ziller valley and the upper Zemm valley to form the Zemm-Ziller power scheme, , In batches for construction. 3 electricity