建筑工程中外墙外保温的施工管理措施

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:pc00000
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国的国土面积约959.62万km~2,但各地区的气候和环境存在较大的差异,建筑施工也需要根据差异性做好调整,这不仅是提高建筑给居民带来的体验,也满足我国对能源节约的要求。但在实际的建筑工程施工建设过程中,外墙保温技术的施工质量还不够稳定,经常会出现一些诸如龟裂、渗水及保温层裂缝等问题。本文对外墙外保温的施工进行剖析,提出建筑工程中外墙外保温施工的管理措施。 China’s land area of ​​about 9596200 km ~ 2, but the climate and the environment in each region there is a big difference, the construction needs to be adjusted according to the differences, which not only improve the building to residents experience, but also to meet our country Energy saving requirements. However, in the actual construction of the construction process, the construction quality of external wall insulation technology is not stable enough, often there will be some problems such as cracking, water seepage and insulation cracks. This article analyzes the construction of exterior insulation and puts forward the management measures for the construction of exterior and exterior insulation.
其他文献
在建筑工程中,进度管理是施工管理的重要内容之一,在整个建筑工程项目管理中占据着重要的位置.企业要想在激烈的市场竞争中占据一席之地,做好进度管理工作是非常重要的.本文
我国的城市发展正发生着巨大变革,城市多元化发展对城市规划设计的要求越来越高。新时期城市规划存在新旧并存的局面我们要进一步总结问题、深化研究使规划设计能够适应新时
建筑工程的全寿命周期是指工程项目建设从它的寿命开始到寿命结束的整个时间段,也可以说是工程项目从构思到最后的拆除的全寿命周期过程。它的主要组成部分为建筑工程的决策
城镇化建设的不断推进,建筑工程项目在逐渐增多,若想提高建筑企业的竞争力,提高企业的经济效益,工程预结算工作变得尤为重要。由于建筑工程项目所持续的时间相对较长,极易受
随着工程建设的增多,工程项目施工管理的重要性也日益显著。施工管理要求在项目建设过程中既要保证利润,又要确保质量、安全、进度,对建筑工程施工过程中出现的问题及时正确
当今的中国正驶在世界发展的快车道,纵使国际经济危机笼罩的各个国家,但我国的经济增长率仍然能维持在高位,傲视全球,这其中离不开建筑工程的贡献。如今全国各地成千上万的建
当前我国开展的建设工程项目越来越多,需求大量的监理人员来对工程建设进行监督管理,确保工程质量安全和工程进度。然而我国目前监理市场缺乏高效的管理,存在很多问题。本文
空气源热泵作为一种新型环保节能设备,在市场中得到了较大范围的使用.本文首先对空气热源泵进行原理及特点的概述;其次通过具体事例,讲述了空气源热泵在学生浴室中的应用;最
本文中考察了不同pH、掺量下,进口阳离子乳化剂W-5与非离子乳化剂Tween 60和Tween 80复配后的效果。测定了所制备的乳化沥青的筛上剩余量和储存稳定性,通过筛选,得到了最佳的
目的:观察咬合创伤时犬三叉神经节(TG)中神经生长因子受体TrkA mRNA及前速激肽原-A(PPTA)mRNA的表达变化,探讨咬合创伤导致口面痛的可能机制.方法:将高出咬合面1.5 mm的镍铬