论文部分内容阅读
中国核建集团想要涉足核电投资业务在业内并非秘密。如果能通过第四代高温气冷堆实现投资和建设、运营一体化,对其而言堪称公司发展中完美的一跃。4月下旬,核电行业一年一度的盛会中国国际核电工业展览会在京开幕。相较于去年,今年的核电展热闹许多,“华龙一号”、“走出去”、“核电重启”纷纷都成为了本次大会的关键词。在这些夺人眼球的展览布置中,不同于以往,中国核工业建设集团公司(下称“中国核建”)首次将高温气
It is not a secret in the industry that China’s nuclear construction group wants to set foot in the nuclear power investment business. If through the fourth generation of high temperature gas-cooled reactor to achieve investment, construction and operation of integration, in terms of the development of the company can be a perfect leap. In late April, the annual nuclear power industry event China International Nuclear Power Industry Exhibition opened in Beijing. Compared to last year, this year’s nuclear power show many lively, “Hualong One ”, “Going out ”, “Nuclear rebate ” have become the key words of this conference. In these eye-catching exhibition layout, different from the past, China National Nuclear Corporation (hereinafter referred to as “China’s nuclear construction”) will be the first high-temperature