黄河上游从青海龙羊峡到宁夏青铜峡(即龙青段),全长918公里,落差大而集中,有许多优良坝址,是我国少有的水电“富矿”。按规划龙青段分为15个梯级电站开发,总利用水头1074米,总装机容量1179万千瓦,年发电量510亿度,相当于3000万吨原煤的发电量。目前正建和已建的有龙羊峡、刘家峡、盐锅峡、八盘峡和青铜峡,总装机容量320万千瓦,
The upper reaches of the Yellow River from Longyangxia, Qinghai to Ningxia Qingtongxia (Longqing section), a total length of 918 kilometers, large and concentrated gap, there are many good dam sites, is China’s rare hydropower “rich ore.” According to the planning Longqing segment is divided into 15 cascade hydropower development, the total utilization of 1074 meters head, with a total installed capacity of 11.79 million kilowatts, the annual generating capacity of 510 billion degrees, equivalent to 30 million tons of raw coal generating capacity. At present, Longyangxia, Liujiaxia, Yanghuoxia, Bapanxia and Qingtongxia currently under construction and built have a total installed capacity of 3.2 million kilowatts,