大峡水电站是国家八五重点建设项目,电站自动控制采用计算机监控为主,常规控制为辅的控制方式。电站总体设计由西北水电勘测设计研究院负责,计算机监控系统由电力部电力自动化研究院负责研制开发,预计1996年11月投入运行。本文主要就大峡电站计算机监控系统的硬件配置及系统功能作一简单介绍。
Daxia Hydropower Station is a national eight five key construction projects, automatic control of power plants using computer-based control, supplemented by conventional control methods. The overall design of the power station is in charge of the Northwest Hydropower Survey, Design and Research Institute. The computer monitoring system is under research and development by the Electric Power Automation Research Institute of the Ministry of Electricity and is expected to be put into operation in November 1996. This article mainly gives a brief introduction to the hardware configuration and system function of the computer monitoring system in Daxia Hydropower Station.