8m× 6m风洞是亚洲最大的低速风洞 ,为了不断满足国民经济发展对风洞试验的要求 ,为了解决本身存在的问题 ,8m× 6m风洞运行 2 0年来首次进行了大规模技术改造。采用了自行研制和引进改进相结合的方式 ,圆满地完成了改造 ,使该风洞的试验能力提高到了一个新的水平。
The 8m × 6m wind tunnel is the largest low-speed wind tunnel in Asia. In order to continuously meet the requirements of wind tunnel test for national economic development, in order to solve its own problems, large-scale technological transformation was first carried out in 8m × 6m wind tunnel in 20 years of operation. Adopting a combination of self-development and introduction of improvement, the transformation has been satisfactorily completed and the test capability of the wind tunnel has been raised to a new level.