沟里水库于1965年7月建成,流域面积44.6平方公里,总库容1004万方,兴利库容627万方,水库枢纽工程由溢流坝、土坝和放水洞组成。溢流坝为浆砌石重力坝,长164.8米,高17.7米,顶宽3.0米;土坝为均质坝,长560米,高12.4米,顶宽3.5米;放水洞为竖井式、闸前为砌石拱涵,闸后为直径1.5米的钢筋混凝土管。该水库以防洪为主,保护下游6公里处莱芜市区、沿河村镇、泰莱公路干线及南治、安仙、鄂庄煤矿等企业,同时减轻汶河、东平湖及黄河的防洪压力。
Ditch reservoir in July 1965 completed, the basin area of 44.6 square kilometers, with a total storage capacity of 10040000 square, Xingli storage capacity of 6.27 million square, reservoir dam project by the overflow dam, earth dam and diversion hole. The overflow dam is a masonry gravity dam with a length of 164.8 meters, a height of 17.7 meters and a top width of 3.0 meters. The earth dam is a homogeneous dam with a length of 560 meters, a height of 12.4 meters and a top width of 3.5 meters. The water drainage hole is a shaft- Before the stone masonry culvert, after the gate of 1.5 meters in diameter reinforced concrete pipe. The reservoir is mainly flood control and protects Laiwu downtown, Yanhe village, Tailai highway and Nazhi, Anxian and Ezhuang coal mines 6 kilometers downstream and flood prevention pressure of Wen River, Dongping Lake and Yellow River at the same time.