论文部分内容阅读
根据锰铁高炉冶炼和炉衬短寿的特点,在中央冶金部、自治区冶金局和桂林地区党委的亲切关怀下,由武汉钢铁没计院等五个兄弟单位领导干部、工人、技术人员组成了高炉内衬试验组,在我厂1~#高炉第一次进行了自焙炭块的试验工作。为了使此项新技术试验获得予想结果,为解决锰铁高炉炉衬短寿的大难题闯出一条新路,探索一种材料来源广、制造工艺简单.施工简便成本低和性能好的优质高炉内衬材料,先后在我厂1、
According to the characteristics of ferromanganese blast furnace smelting and lining short life, under the cordial care of the Central Metallurgical Department, the Metallurgical Bureau of the Autonomous Region and the Guilin Regional Party Committee, the leading cadres, workers and technicians from five fraternal units such as Wuhan Iron and Steel Institute did not form a blast furnace Lined test group, in our factory 1 ~ # blast furnace for the first time since the baking carbon block test work. In order to get the desired results of this new technology test, a new road was created to solve the big problem of the short life of the ferromanganese blast furnace lining, and the exploration of a wide range of materials with a simple manufacturing process, simple construction, high quality blast furnace with low cost and good performance Lining material, one after another in our factory,