小浪底水利枢纽工程现已通过蓄水阶段验收,这标志着小浪底水库开始发挥调蓄作用。小浪底水利枢纽位于控制黄河洪水和泥沙的关键部位,以防洪、防凌、减淤为主,兼顾供水、灌溉和发电,是治理开发黄河的控制性工程。工程总投资347.46亿元,目前已完成206.48亿元。自1997年10月截流以来,施工进展顺利,39980名移民的搬迁安置和其他工
Xiaolangdi Water Control Project has passed the acceptance stage of storage, which indicates that Xiaolangdi reservoir began to play a regulatory role. The Xiaolangdi Multipurpose Dam Project is located at the key part of controlling the flood and sediment of the Yellow River. Flood control, flood prevention and siltation reduction are the two main tasks. Water supply, irrigation and power generation are also taken into consideration. It is a controlled project to harness and develop the Yellow River. The total investment of 34.746 billion yuan project, has completed 20.648 billion yuan. Since the river closure in October 1997, construction has proceeded smoothly, with 39,980 resettlers and other workers