随着铁路建设的快速发展,大型预制箱梁在铁路施工中的应用越来越广泛。大型箱梁架设由于其构件大、工艺复杂、设备操作要求高、事故后果严重等特点,给安全管理带来很大难度,本文以石武客专河南段漯-驻特大桥900吨箱梁架设为例,分析下导梁架桥机架设预制箱梁时的安全管理工作。石武客运专线(DK850+281.45~DK871+000)段预应力混凝土简支箱梁(双线)架设,全长20.718千米,共621孔箱梁,其中32米箱梁613孔,24米箱梁8孔,由漯河制梁场负责预制、架设。
With the rapid development of railway construction, the application of large precast box girders in railway construction is more and more widely used. Large box girder erection due to its large components, complex technology, high equipment requirements, the consequences of serious accidents and other characteristics to the safety management to bring great difficulty in this paper Shiwu Hakka Henan Section Luo - Bridge in 900 tons of box girder erection As an example, the safety management of the girder under the girder is analyzed. Shiwu passenger dedicated line (DK850 + 281.45 ~ DK871 + 000) section of prestressed concrete simple support box girder (double line) erection, full-length 20.718 km, a total of 621 hole box girder, of which 32 meters box beam 613 holes, 24 meters box Beam 8 hole, made by the Luohe Beam Farm prefabricated, erection.