1 概况百松堰工程位于越南河内市西南200km的珠江上,为一灌溉渠首枢纽工程。主要由175m长溢流堰、3孔冲砂闸、7孔进水闸、船闸及挡墙等建筑物组成。该工程20年代由法国修建,几经战争和洪水的破坏,老化失修。水从结构中渗出并从堰体砼中冲走许多水泥成分,造成透过堰体漏渗量很大。为解决渗漏破坏问题,在溢流堰及三个闸的上游面建造1m厚的钢筋混凝土防渗墙。该墙6m长为一工作槽段,
1 Overview Baise weir project is located in the Pearl River in South Vietnam 200km southwest of Vietnam, as an irrigation canal project. Mainly by the 175m long overflow weir, 3 hole red sand gate, 7 hole intake, ship lock and retaining wall and other buildings. The project by the 1920s built by France, after several war and flood damage, aging disrepair. Water leaking from the structure and washed away from the concrete in the concrete many cement composition, resulting in leakage through the weir body is very large. In order to solve the problem of leakage and destruction, a 1m thick reinforced concrete cutoff wall was built on the overflow weir and the upstream of the three gates. The wall 6m long as a work slot,