由于三峡电站的总发电流量大于葛洲坝电站的总发电流量,因此计划在葛洲坝电站扩建4台175 MW的机组,以减少弃水损失。对扩机电站的设计方案予以介绍。
As the total power generation flow of the Three Gorges Power Station is larger than the total power generation flow of Gezhouba Power Station, it plans to expand 4 units of 175 MW at Gezhouba Power Station to reduce the loss of water. Expansion of power station design to be introduced.