论文部分内容阅读
介绍在大亚湾核电站毗邻进行的土石方工程爆破试验及其振动监测的结果。实验结果表明所拟定的“土石方开挖工程爆破方案”和“大亚湾核电站安全振动监测方案”都是有效的、可行的,它既可保证了大亚湾核电站安全运行,又能满足岭澳核电站工程的进度。
The results of earthwork blasting tests and vibration monitoring conducted at Daya Bay Nuclear Power Station are introduced. The experimental results show that the proposed “earthwork excavation blasting program” and “Daya Bay Nuclear Power Station Safety Vibration Monitoring Scheme” are effective and feasible, it can guarantee the safe operation of Daya Bay Nuclear Power Station, but also to meet the progress of the project of Ling Ao Nuclear Power Station .