论文部分内容阅读
施工阶段的成本控制是水利工程项目成本控制的关键,为此,项目管理人员要在施工阶段针对工程实际情况制定切实可行的方法,本文在分析水利工程成本控制要点的基础上,结合一个具体的工程实例,讲述了如何处理好工程变更、索赔等问题,希望对同行们的工作有所借鉴意义。
The cost control in the construction stage is the key to the cost control of water conservancy project. Therefore, the project management personnel should work out practical methods for the actual situation of the project in the construction stage. Based on the analysis of the key points of cost control in the water conservancy project, combined with a concrete The project example tells how to deal with the engineering change, the claim and other issues, hoping to have a reference for the work of colleagues.