我市所辖某化工厂一台DEL2-10型锅炉,在煮炉后,未经打开人孔、手孔清洗,而继续运行,4天后发生鼓包,幸发现及时,紧急停炉,未造成更大的危害。该炉1986年12月制造,1987年安装投用,使用后压力低于0.8MPa,三班制运行,至锅炉鼓包发生时实际运行时间不足三年,经现场检查,鼓包位于锅筒前部直接见火区,变形区域,长轴670mm,短轴430mm,呈不规则形状,有两个外凸的峰值区,最大值为32mm。硬度和厚度对比测定:非变形区HB111,壁厚13.5mm,鼓包最大部位硬度HB93,壁厚11.6mm,硬度有所降低,壁厚实际减薄1.9mm。
A municipality under the jurisdiction of a chemical plant DEL2-10 type boiler, after cooking stove, without opening the manhole, hand hole cleaning, and continue to run, 4 days after the drum kits, fortunate enough to find timely emergency shutdown, did not result in more Big harm. The furnace was manufactured in December 1986 and put into use in 1987. The pressure after use is lower than 0.8MPa. The operation time is less than three years when the boiler drum is in operation in three-shift operation. After the on-site inspection, the drum is located directly in front of the drum See the fire area, the deformation area, the long axis 670mm, short axis 430mm, was irregular shape, there are two convex peak area, the maximum value of 32mm. Comparison of hardness and thickness determination: HB111 non-deformation area, the wall thickness of 13.5mm, the maximum part of the drum hardness HB93, wall thickness 11.6mm, hardness decreased, the actual thinning of 1.9mm wall thickness.