论文部分内容阅读
金沙江向家坝、溪洛渡水电站予可审查由电力部、四川、云南两省人民政府和中国长江三峡工程开发总公司共同主持.参加单位60余个,代表、专家约200人,我院应邀代表林业部参加了审查会,会议于一九九六年五月十四日至二十二日在北京审查通过.向家坝(装机600万KW,总库容54.2亿m~3,最大坝高151m,回水长度156km,距宜宾33km),溪洛渡(装机1440万KW,总库容140.2亿m~3,最大坝高295m,回水长度206km,距宜宾184km)系长江上游金沙江梯级开发最末两座以发电为主,兼有防洪拦沙、航运、漂木等综合效益的特大型水利水电枢纽工程.其开发建设为实现西电东送,优化华东、华中地区能源结构,发展西南经济,充分发挥三峡工程效益均具有重要意义.
Jinsha River Xiangjiaba, Xiluodu Hydropower Station to be reviewed by the Ministry of Electric Power, Sichuan and Yunnan Provinces People’s Government and China Three Gorges Project Development Corporation co-chaired by more than 60 participants, representatives, experts about 200 people, our hospital was invited representatives The Ministry of Forestry participated in the review meeting which was reviewed and approved in Beijing from May 14 to January 22, 1996. Xiangjiaba (with an installed capacity of 6 million KW, a total capacity of 5.42 billion m 3 and a maximum dam height of 151m , Backwater length of 156km, 33km away from Yibin), Xiluodu (14.4 million KW installed capacity, total storage capacity of 14.02 billion m 3, maximum dam height 295m, return water length 206km, Yibin 184km) Block to generate electricity, both flood control, shipping, floating wood and other comprehensive benefits of large-scale water conservancy and hydropower hub project. Its development and construction of the West to East, optimize the energy structure in East China and Central China, the development of Southwest economy, full It is of great significance to exert the benefits of the Three Gorges Project.