论文部分内容阅读
一、概况福建连城水电站为一径流式电站,共装机两台,总容量为6,400kw。机组的有关数据如下:水轮机型号HL160WJ-71型(后改为HLD06A-WJ-71);额定出力3,200kW(改型后实发3,400kW);额定转速1,000r/min;最大水头113.3m,额定水头110m(实际为106m),最小水头106m;额定流量3.54m~3/h;机组所需供水量(实测值),空气冷却器15.2m~3/h(厂家提供的资料为30m~3/h),推力轴承供水量0.63m~3/h,发电机上导轴承供水量0.28m~3h,
I. Overview Fujian Liancheng Hydropower Station is a runoff power station with a total installed capacity of 6,400kw. Unit related data are as follows: Turbine model HL160WJ-71 (later changed to HLD06A-WJ-71); rated output of 3,200kW (modified after the actual 3,400kW); rated speed 1,000r / min; maximum head 113.3m, rated The water head 110m (actually 106m), the minimum head 106m; rated flow 3.54m ~ 3 / h; unit required water supply (measured value), air cooler 15.2m ~ 3 / h (provided by the manufacturer 30m ~ h), thrust bearing water supply 0.63m ~ 3 / h, generator guide bearing water supply 0.28m ~ 3h,