我厂是采用密闭鼓风炉—前床—转炉的炼铜工艺。由于精矿成分混杂,既有硫化矿,又有氧化矿,还伴有活性炭,使两台鼓风炉的床能率很低,平均只有27(吨/米~2·日)左右。加上管理水平差,两台炉子常出事故,需停风检修。由于是一个炉子一个前床,对每个前床来说,流过前床的熔体有限,热交换量就达不到技术要求,造成前床四周熔体凝结,空间变小;停风小修时,前床冻结现象就更严
I plant is a closed blast furnace - bed - converter copper smelting process. Due to the mixed ore concentrate, both sulphide ores and oxidized ores, together with activated carbon, the bed capacity of the two blast furnaces is very low, with an average of only 27 (t / m ~ 2 · day). Coupled with the poor management level, two stoves often accident, need to stop wind maintenance. As a front bed of a furnace, for each front bed, the melt flow through the anterior bed is limited, the amount of heat exchange does not meet the technical requirements, resulting in melt condensation around the anterior bed, smaller space; When the anterior bed freezing phenomenon is more stringent