论文部分内容阅读
1反应堆运行情况按照中国先进研究堆(CARR)运行室2013年年度工作计划,CARR本年度启动反应堆共计9次,在不同功率水平下累计运行约118 h,最大稳定运行功率为56 MW,总释放能量约31.44 MW·d。本年度未进行换料。其中,4—5月进行水冷同位素系统改造项目通量测量和堆内热工实验;11—12月进行水平孔道整改后试验、配合物理所进行水平孔道中子散射实验等。2维修、试验和检查按照《维修大纲》和《定期试验和检查大纲》要求进行系统和设备的维修保养、定期功能试验
1 Reactor Operation According to the 2013 annual work plan of China Advanced Research Reactor (CARR) operating room, CARR started the reactor a total of 9 times this year, accumulating about 118 hours of operation at different power levels, the maximum stable operating power was 56 MW and the total released energy About 31.44 MW · d. This year did not refuel. Among them, from April to May carried out water-cooled isotope system transformation project flux measurement and thermal engineering reactor; 11-12 months after the horizontal hole rectification test, in line with the physical horizontal hole neutron scattering experiments. 2 Maintenance, testing and inspection According to the “maintenance program” and “periodic tests and inspection outline” system and equipment maintenance, regular function test