论文部分内容阅读
摘自1988,№19,48 苏联切列波维茨冶金厂和乌拉尔钢铁研究所共同研究和利用含钒转炉渣在钢包中对钢合金化的工艺。这种渣含9.5%V,试验钢是在350 t转炉冶炼的08ΓCΦ钢。试验钢的冶炼工艺和该厂正常采用的工艺没有区别。在转炉向钢包出钢开始时就添加转炉钒渣6~8 kg/t以代替钒铁,同时加入铝铁(1 kg/t)。其它铁合金按技术规程加入。新工艺共炼钢15炉。
Excerpt from 1988, № 19,48 Chernobyl Metallurgical Plant of the USSR and Ural Institute of Iron and Steel jointly research and use of vanadium-bearing converter slag in steel ladle steel alloying process. This slag contains 9.5% V, the test steel is 08ΓCΦ steel smelted in a 350 t converter. There is no difference between the test steel smelting process and the normal process used by the plant. At the beginning of the tapping of the converter to the ladle, 6-8 kg / t of converter vanadium slag was added instead of ferrovanadium and ferro-aluminum (1 kg / t). Other ferro-alloys according to the technical regulations to join. New technology co-steel 15 furnace.