论文部分内容阅读
高林植小组是在深井下面30~40公尺沿着花岗岩与泥质砂岩接触带掘进水平坑道。岩石硬度为3~4级的泥质砂岩、泥质页岩与占平巷断面20—30%的5~6能的花岗岩。坑道断面为2.34平方公尺,采用木材支柱,手工打眼,人力运搬,辘轳提升,每天一班(8小时)掘进。1958年5月份进尺31.58公尺,6月份提高为月进50.12公尺,五个月共完成生产任务211.15公尺,给国家创造了价值55250元的财富。他们的经验主要是:
The Gaolin Group led a horizontal tunnel along the contact zone between granite and shaly sandstone 30 to 40 meters below the deep well. Shale hardness of 3 to 4 level of argillaceous sandstone, shale shale and accounted for 20-30% of the section 5 ~ 6 can granite. The section of the tunnel is 2.34 square meters, using wood pillars, hand-drilling, manual handling, ascending of the potter’s wheel, and daily (8 hours) tunneling. 1958 May into the 31.58 meters, increased in June to 50.12 meters per month, five months to complete a total production of 211.15 meters, to the state created a value of 55,250 yuan in wealth. Their experience is mainly: