论文部分内容阅读
关于建筑工程造价控制与管理分析探讨
【机 构】
:
株洲市荷塘区财政投资评审中心 湖南株洲 412000
【出 处】
:
建筑工程技术与设计
【发表日期】
:
2021年4期
其他文献
In the present paper,the interaction of surge,wave and tide is firstly assessed using acoupled model of surge,wave and tide.
会议
Hurricane Katrina (23-30 August 2005) was the costliest ($108 billion 2005 USD) and one of the five deadliest hurricanes to ever strike the United States of Ame
会议
Storm surge height is usually determined as the surplus of height suctioned by atmospheric low pressure and that drifted by strong winds.Those two type models h
会议
Storm surge is an important issue in Taiwan because our country is located at the typhoon prone area and surrounded by the Pacific Ocean and the Taiwan Strait.
会议
2015年的最后一个月,中央在时隔37年后再次召开全国性的城市工作会议,且会议的名称从以前的“全国城市工作会议”升级为“中央城市工作会议”。众所周知,当前我国经济增长面
Flood and tide features at Min River tidal reach are analyzed and a high-resolution flood-tide coupled model which used high-resolution GIS data for Minjiang Es
会议
Information of maximum water level,including wave set-up height,at a river entrance is very important in terms of river mouth morphology change,navigation trans
会议