论文部分内容阅读
全面采用大揭盖施工模式进行营业线集中成段换枕施工,在我国繁忙营业线200 km/h提速改造施工中还是第一次,这种方法不但降低了劳动强度,而且提高了换枕效率。通过对比3种不同的换枕组织方法,详细介绍其中一种针对不同劳动对象而采取的换枕作业新方法。
Full coverage of the construction mode with a large open cover business line into a block into the pillow for the construction of the busy business line in our country 200 km / h speed transformation of the construction for the first time, this method not only reduces the labor intensity, but also improves the efficiency of the pillow . By comparing three different methods of bolster, one of the new methods of bolster for different labor objects is introduced in detail.