高原油井作业时,受到井场大小、作业机品种的限制,只能雇用推土机完成高原抽油移机工作,费用非常昂贵,同时具体操作复杂、时间长短不定、给抢开作业井、提高油井时率造成一定的影响。通过现场调查研究,在保障高原抽油机迅速、及时、安全、低费用前提下,精心设计了《直流液压式高原抽油机移位装置》,通过反复试验和现场实际应用,在油井作业现场移机技术上获得很大的成功。
Plateau wells, by the size of the well site, the variety of operating restrictions, only bulldozers hired to complete the work of plateau pumping transfer machine, the cost is very expensive, while the specific operation is complicated, the time length of uncertainty, to open the job well to raise the well Rate has a certain impact. Through on-site investigation and research, under the precondition of ensuring the rapid, timely, safe and low cost of the plateau pumping unit, the “DC hydraulic pressure plateau pumping unit displacement device” has been carefully designed. Through repeated experiments and field practical application, Transfer machine technology has great success.