论文部分内容阅读
本文阐述凌津滩水电站电工二次专业各部分为实现电站无人值班进行工程设计所考虑的各要点,以期达到服务于凌津滩水电站施工设计的目的。
This article elaborates the main points of Lingdian Hydropower Station’s secondary professional departments in order to realize the engineering design of unmanned power station in order to achieve the goal of serving the construction design of Lingjintan Hydropower Station.