陕西省水利水保厅,省地下水工作队根据合同要求对渭南、宝鸡、咸阳等地(市)1986年机井测改工作进行了全面验收。1986年各地对机井测改工作加强领导,在落实任务、培训技术骨干、狠抓典型、保证工程进度和质量、建立管理服务体系、完善管理责任制等方面作了大量工作,全年测改机井任务220.0眼,实际完成2900眼,改造任务2000眼,完成2331眼,并建成示范井12眼,改善井灌面积18.6万亩。经过测改的机井,经济效益显著提高,单井千吨米能耗平均由改前的11.57度降低到7.49度,降低4.08度:装置效率由改前的23.5%提高到36.4%,增加了12.9%。衬砌渠道181公里,渠系水利
According to the contract requirements, Shaanxi Provincial Bureau of Water Conservancy and Water Conservation and the provincial groundwater task force carried out a full inspection of the well testing work in Weinan, Baoji, Xianyang and other places (cities) in 1986. In 1986, all localities strengthened their leadership over the well testing and testing work, and made a great deal of work in implementing the tasks, training the technical backbone, focusing on the model, ensuring the progress and quality of the project, establishing the management service system, and improving the management responsibility system. The task 220.0 eyes, the actual completion of 2900 eyes, the transformation of the task of 2000 eyes, completed 2331 eyes, and built 12 demonstration wells to improve well irrigation area of 186000 acres. After the test, the economic benefits have been significantly improved. The average energy consumption per kilometer of single well has been reduced from 11.57 degrees before the change to 7.49 degrees and 4.08 degrees lower: the installation efficiency has increased from 23.5% to 36.4%, an increase of 12.9% %. Lining channel 181 kilometers, canal water system