以称钩河流域为研究对象,对坝系工程建设、拦水蓄水、工程安全等方面进行监测。监测结果显示,流域内水土流失治理程度达到66.06%,骨干坝、中型坝、小型坝结构比为1∶1.1∶1.6;由于2007年新建淤地坝数量较多,对其控制范围内的土壤扰动大,易引起水土流失,所以2008年坝系拦沙率较高,为30.27%;由于不再引水灌溉,2007年以后用水变化率明显减小;淤地坝坝体及泄水建筑物完好、运行正常,近期没有出现病险坝和毁坏坝。坝系工程建设模式基本合理,建成后称钩河流域整体拦沙率达到99.38%,基本做到了泥不出沟,发挥了显著的生态、社会和经济效益。
With the name of Gou river basin as the research object, the dam system construction, water storage and water supply, project safety and so on are monitored. The monitoring results show that the degree of soil erosion control in the basin reaches 66.06%, and the ratio of backbone dam, medium dam and small dam is 1: 1.1: 1.6. Because of the large number of newly built check dams in 2007, soil disturbance within its control range Large and liable to cause soil erosion. Therefore, the silt-holding rate of the dam system in 2008 was high at 30.27%. Since no irrigation was conducted, the change rate of water use after 2007 markedly decreased. The dam body and drainage structures of the silt- Normal operation, there is no recent dams and dam damage. Dam system construction mode is basically reasonable, after completion of the said hook river Basin overall sediment removal rate reached 99.38%, the basic mud did not ditch, played a significant ecological, social and economic benefits.