一、工程概况茅山岗水电站坝址位于乐安河上游长乐水分支梧风洞溪的茅山岗村西南约0.6公里处。坝址以上控制流域面积65平方公里,水库仅具有不完全年调节性能,系单一发电枢纽。本电站装机容量1890千瓦,多年平均发电量为770万度。如果上游双河口水电站建成联合运行时,则年发电量可以提高到893万度,还可增加下游七座小水电站的发
I. Project Overview The Maoshangang Hydropower Station dam site is located about 0.6 km southwest of Maoshan Village of Wufengfengxi River in the upper reaches of Le’an River. The control basin area above the dam site covers an area of 65 km 2. The reservoir only has an incomplete annual regulation performance and is a single power generation hub. The power plant installed capacity of 1890 kilowatts, the average annual generation capacity of 7.7 million degrees. If the upper reaches of the Shuanghekou Hydropower Station is completed and the joint operation, the annual power generation can be increased to 8.93 million degrees, but also increase the downstream seven small hydropower stations