2013年5月,水利部水利水电规划设计总院会同广西壮族自治区水库移民工作管理局在广州市召开大藤峡水利枢纽工程初步设计阶段建设征地移民安置规划设计工作大纲审查会。会议听取了大藤峡开发公司关于大藤峡水利枢纽工程项目工作进展情况的汇报,设计单位广西水利电力勘测设计研究院汇报了大藤峡水利枢纽工程初步设计阶段建设征地移民安置规划设计工作大纲的主要内容,与会代表就工作大纲的内容
In May 2013, the General Bureau of Water Conservancy and Hydropower Planning of the Ministry of Water Resources together with the Reservoir Resettlement Administration of Guangxi Zhuang Autonomous Region held a review meeting on the planning outline for land acquisition, resettlement and resettlement planning at the preliminary design stage of the Greater Tengxia Hydraulic Project in Guangzhou. The meeting listened to the report of the development project of the Big Tengxia Project on the progress of the project and the design unit Guangxi Hydroelectric Power Survey and Design Institute reported the main contents of the Outline of the Planning and Design of Land Acquisition and Resettlement during the preliminary design phase of the Greater Tengxia Hydraulic Project Participants on the outline of the work