论文部分内容阅读
日本东海炭素公司天津工厂的二期扩产工程正在建设之中,预计2012年底竣工,2013年初投入运营,将新增炭黑年产能6万t,包括1条年产3万t软质炭黑生产线和1条年产3万t硬质炭
The expansion of the second-phase expansion project of the Tokai Carbon Co. Tianjin Plant under construction is under construction. The project is expected to be completed by the end of 2012 and put into operation in early 2013, with an annual capacity of 60,000 tons of carbon black to be added, including 1 soft carbon black Production line and an annual output of 30000 t hard carbon